TECK Mining
Due to changes mandated by Environment Canada, TECK Mining required a new building for the storage and mixing of various ores before smelting at their Trail, BC operation. The building dimensions were 200 meters by 60 meters, with an overall height of 21 meters. Initially, the design called for cast-in-place (CIP) concrete; however, TECK expressed […]